Tuesday, September 18, 2012

Accessory building!

We applied for the accessory building to be piggybacked on our building permit.  We finally got the drawings turned in Friday morning!  Yay!

We had our excavator do the site prep.  It has since rained (of course) and who knows if he will have to come back out to fix things.  It doesn't need to be perfectly level, but within one foot of level.  So, maybe the rain was OK?  It was a slow drizzle all day.  I don't really want to think about what the basement and garage pad look like right now. Sigh.  

Here are some pictures:
Garage pad

 Garage pad on right, basement hole on left.  

Looking a little more left at the basement hole

Going down into the finished basement.  
The dig out 3 extra feet around the measured house and then add a ramp.  

Family picture!!!

No comments: